How Long Does a Bathroom Renovation Take? Real Timeline From Design To Completion

Bathroom Renovation

Bathroom renovation is not as simple as it looks, especially when you have custom decorative and functional requirements. Primarily, they impact the overall timeline. After that, the size of your bathroom, the material choice, and the contractor’s expertise impact the project completion time. You must go for careful planning regardless of your scope of bathroom remodeling. 

But you should not worry about anything else because Apartment Renovation Dubai will share a complete guide with you. In this, we’ll talk about how long a bathroom remodeling actually takes, from design to completion. You’ll have a realistic timeline at the end. So, let’s start with the article. 

Pre-Remodeling Stage Of Bathroom | Start From Here!

Remodeling Stage Of Bathroom
Primarily, we focus on making a budget and planning initial steps, such as layout selection, getting approvals, and contacting the right bathroom renovation company. 

Deciding Budget & Initial Planning 

Set your initial budget and start planning the bathroom remodeling. Whether you’re fully renovating the bath or partially making some changes, it will help you decide on the budget. After setting your goals of revamping, set a realistic budget and do not delay the project. Delaying might affect the prices of materials and service quotes. later on.

Layout Planning & Design 

You must focus on the design of your bath here and choose everything from the material type, color & texture by keeping styling goals. Do not forget this while selecting the flooring tiles, window curtains, blinds, vanity, and other fixtures. And yes, make decisions at first because later delays the project timeline. 

Permits and Approvals

Renovating your bathrooms in Dubai requires approvals from the respective authorities. The higher authorities that look for economic developments, electrical and plumbing, and structural changes provide licenses. If you’re making major structural and plumbing changes, the licenses might apply to you. Getting licenses is also a lengthy procedure if you have a major project, so consult with the contractor accordingly. 

Week-By-Week Breakdown Of Practical Bath Renovation

Breakdown Of Practical Bath Renovation
Once you get the license from the development and management authorities, it’s time to practically start everything. Here’s the step-by-step breakdown of the complete bath revamping that you must pay attention to. You have to mark the date and start tracking the performances.  

Week 1: Demolition Of Bathroom 

Start by removing everything from your bath and free up the space. Whether it’s your fixtures, furniture items, lighting, or old electrical wiring. This is because demolition is necessary to ensure perfect bath remodeling. 

Week 2: Plumbing & Electric System Repairs

Inspect issues in your plumbing & electrical systems and repair them carefully. Repair damaged wires and take care of smaller to larger plumbing cracks. Sometimes, you have to change the entire wiring systems and pipes to ensure safety and building standards. 

Week 3: Structural Repairs Of Bathrooms 

The structural improvement must be done carefully without rushing the process. Primarily, it involves leveling your walls by filling holes & cracks, adding new dry walls, and much more. Keep your plumbing system and electrical wiring while doing this. 

Week 4: Improving Bathroom Flooring 

One of the most important bath renovation steps that takes the most time is flooring installation. You have to level the floor, make it clean, and let it dry. After that, you’ll be eligible to install the new tiles in any geometric pattern. Indeed, simple tile installation requires less time than the complex one.

Week 5: Replacing Your Bath Fixtures 

Promote replacement of your bathroom fixtures, such as vanity, cabinet, toilet, bathtub, and shower. You can use the existing ones if they are adjustable and you don’t want to replace them. During the fixture installations, you have to check with the plumbing and electrical concerns. 

Week 6: Painting Your Bathrooms & Refinishing

It’s time to refinish your bathroom to get appealing results. You can start by painting your walls with the right paint types. Also, install various wallpapers and promote a deep cleaning. Similarly, we recommend that you deep-clean the flooring tiles and have a fresh bathroom look. 

Inspect Quality Of Renovation (1-3 Days)

You must have a deep quality check before you start using your bathroom. Ensure every fixture functions properly and everything looks flawless. This stage usually includes:

  • Inspecting taps & showers, electrical outlets, and light checks. 
  • Deeply inspecting plumbing systems and the leakage of pipes
  • Verifying flooring tiles, sealing, and perfect edge joining
  • Fixing any paint marks if you have on the floor and touch-ups

What Delays Your Bathroom Renovation Project?

You might face delays in renovating your bathrooms, even if you have good planning. That’s due to various reasons. We enlisted them below, so you must be prepared for them.

  • Issues Scheduling Renovation: The unplanned absence of your remodeling contractor team might delay the project timelines. 
  • Delays Getting Licenses: Due to many reasons, sometimes you get late renovation approvals, which cause delays. 
  • Issues With Plumbing: You might find plumbing system issues, such as leaking cracks, during the bathroom demolition steps that require time for repairing. 
  • Material Shortage: The late delivery of your desired flooring tiles and fixtures, or other bathroom remodeling materials delivery causes delays. 

Wrapping Up!

Finally, we shared how long it takes you to renovate a bathroom. We break down the expected time from demolition to electrical and plumbing changes, structural repairs, to improving fixtures, and installing new floor tiles. We also discussed how long a simple to complex refinishing and repairing takes. 

From making plans for your bathroom remodeling to deciding budget and getting licenses, every step has its expected timeline. Sometimes, you may get everything done quickly. However, sometimes you have to wait due to unexpected reasons. You’ll only get the satisfied results when you pay each step the required attention regardless of time. For more information, contact us now!

 